P.K. SHARMA

Cyber security intelligence, AI governance, practitioner analysis

← All 93 controls

Annex A 5.8

Information security in project management

Security requirements are considered within projects, whatever methodology the organisation uses.

What an assessor looks for

Pick a recent project and trace where security entered it. A gate, a requirement, a risk assessment, a review. If security appears only at go-live, this control is not operating.

Where it usually fails

The process describes a security gate that recent projects bypassed without an exception being recorded.

Classification

Theme
A.5 Organisational
Control type
Preventive
Security properties
Confidentiality, Integrity, Availability
Cybersecurity concepts
Identify, Protect
ISO 27001:2013 equivalent
6.1.5, 14.1.1

Control number and title are identifiers used as references. The classification above is our own analysis, aligned to the shape of the ISO 27002 attribute model rather than reproduced from it, and no text from the standard appears on this page. Last reviewed 2026-08-03.

Building the Statement of Applicability?

Record your applicability decision for this control and the other 92 in the browser-based builder. Nothing is transmitted, and you export the file at the end.

Open the SoA builder